Tuesday, 13 September 2016

Bright Hill - POB launch

The 2 replacement POBs for the project were launched at Ang Mo Kio Avenue 3 and Upper Thomson Road in August and September respectively. The new bridges are simply spanned with staircases re-positioned to avoid the tunnel alignments leading up to the Bright Hill station. TBM 2 is progressing on its initial drive to Upper Thomson and the other 3 TBMs are being assembled up in the launch shafts. 

Another realignment of Sin Ming Avenue took place earlier this quarter to facilitate the final stretch of secant bored pile works south of the station box. Excavation and basement RC works have commenced at entrance B.


Realignment of Sin Ming Avenue (west bound carriageway) for final stretch of SBP works
Replacement POB launched last week along Upper Thomson Road for the TBM drives to Upper Thomson Station
Existing bridge would be the 7th to be demolished for the Thomson Line project

Assembly of TBM 3 completed and awaiting launch (top), TBM 1 on it's initial drive to Upper Thomson Station
Tight site constraints positions a permanent mobile crane to facilitate hosting works at the launch shaft
TBM 1 on its initial drive - Woodlands bound tunnel to Upper Thomson
TBM 3 assembly works and reaction frame fit up. The TBM is only expected to launch upon the transition of TBM 1 to main drive
Bored pile works along the station box

Bored pile works at entrance D
Excavation and RC works at Entrance B


Bored pile works at entrance C






North C&C tunnel



Assembly of TBM 2 for the Woodlands bound tunnel drive to Mayflower
TBM 4 assembly on the Changi bound tunnel drive to Mayflower
Replacement POB at AMK Avenue 3 launched in August for the tunnel drive to Mayflower
Existing bridge would be the 6th to be demolished for the Thomson line project



Block 258 landscape reinstatement