D-walling work continues at the Maxwell Station. Excavation of the topsoil at the south end prepares for the casting of the roof slab for the top-down construction of the station.
Bored pile foundation works |
Trenching of the diaphragm wall panel with bentonite support |
No comments:
Post a Comment
Note: only a member of this blog may post a comment.