Piling works, together with minor excavation and casting works progress at the Woodlands North site.
![]() |
![]() |
![]() |
![]() |
| TBM2 (Feb) |
![]() |
![]() |
![]() |
![]() |
![]() |
| Southbound tunnel (TBM1) |
| Position of TBM2 under Woodlands Drive 91 (umbrella) |
![]() |
| Position of TBM1 at Block 874, Woodlands St 81 |
![]() |
| Installation of real-time instrumentation at Riverside Sec Sch |
| T202 WDN-WDL TBM progress |