Piling works, together with minor excavation and casting works progress at the Woodlands North site.
TBM2 (Feb) |
Southbound tunnel (TBM1) |
Position of TBM2 under Woodlands Drive 91 (umbrella) |
Position of TBM1 at Block 874, Woodlands St 81 |
Installation of real-time instrumentation at Riverside Sec Sch |
T202 WDN-WDL TBM progress |
No comments:
Post a Comment
Note: only a member of this blog may post a comment.