Piling at Mayflower (II)

Bore piling works continue at the Mayflower site. A second traffic diversion was implemented mid-December at the junction of Street 11, swinging the twin carriageway of Avenue 4 towards the west. The diversion will last for 2-3 months. Instrumentation works have also begun with tiltmeters installed along the columns of the HDB flats surrounding the site.

Penta Ocean from the neighboring contract T211 is also preparing a small site south of Mayflower for preparatory works of the 2 TBMs that will be driven from Bright Hill, both of which will go beneath the foundations of Block 258. More will be shared in the T211 update.


December 24 - Panorama of Mayflower, T210
December 24 - Close up of traffic diversion 1A
October 8 - Drive through the Mayflower site along Avenue 4
October 8 - Drive through the Mayflower site along Avenue 4
October 8 - Drive through the Mayflower site along Avenue 4
October 8 - Drive through the Mayflower site along Avenue 4
October 8 - Drive through the Mayflower site along Avenue 4
October 8 - Drive through the Mayflower site along Avenue 4
Outline of the existing diversion in place (TD 1A)
The new diverted road (Dec 24)
Mayflower station (Dec 24)
Mayflower station (Dec 24)
Mayflower station (Dec 24)