Contract T210 is for the construction of the Mayflower station and was awarded to Hong Kong-based Gammon Construction, who have completed both the North East Line (NEL) and Downtown Line (DTL) Chinatown stations and the Bukit Panjang LRT previously. Mayflower station will see the most exits on any Thomson Line station with 7 exit structures being built. Situated on a slight incline, the station will see construction taking place in close proximity to many HDB blocks around. Already, a number of trees have been chopped down to make way for the station construction and will be re-planted once construction is done. Some walkways between the blocks will be demolished in the process as well.
A view of Ang Mo Kio Avenue 4 near the Kebun Baru CC on 4 May 2014 |
Looking down towards the main construction site. |
A view of the existing tree cover on 4 May 2014. |
A notice on bored pile work 4 May 2014 |
A notice on bored pile work 4 May 2014 |
4 May 2014 |
4 May 2014 |
Barricades set up by Gammon Construction 4 May 2014 |
Barricades set up by Gammon Construction 4 May 2014 |
An exit structure will come up here by 2020 4 May 2014 |
4 May 2014 |
4 May 2014 |
4 May 2014 |
Machinery to bore the secant bored piles 4 May 2014 |
4 May 2014 |
4 May 2014 |
4 May 2014 |
4 May 2014 |
4 May 2014 |
This linkway is one of those that will make way for station construction 4 May 2014 |
Alternative linkways will be built to replace those demolished 4 May 2014 |
4 May 2014 |
4 May 2014 |
4 May 2014 |
Another site where bored piling will commence 4 May 2014 |
4 May 2014 |
4 May 2014 |
A notice showing the locations of sheet pile works 25 May 2014 |
25 May 2014 |
Hoarding going up at a sheet pile work location 25 May 2014 |
25 May 2014 |
25 May 2014 |
25 May 2014 |
Works for a new drain underway 25 May 2014 |
25 May 2014 |