Tuesday, 29 September 2015

Piling at Napier (III)

›
Piling works continues along the center perimeter of the Napier station following the traffic diversion in July. Excavation of the launch s...
Monday, 28 September 2015

Stevens D-walls (II)

›
Excavation of the Dalvey launch shaft is now midway completed. The slurry treatment plant is in the midst of installation beside the shaft....
Saturday, 26 September 2015

Haze Contingency Measures

›
In light of the recent deterioration of the haze conditions across the country, preventive actions have been stepped up to protect the welf...
‹
›